| Home | NC Title V | NC MACT | Coal-Fired EGUs | People | Technical | Links |
|---|
| PE Sutton Home | Emissions | Controls | Map/Photos | IBEAM |
|---|
Unit 1: One ESP (Research-Cottrell hot side type) installed on: One coal/No. 2 oil/on-spec used No. 2 oil-fired electric utility boiler (1,266 mmBtu/hr heat input) Equipped with low-NOx burner system, and Separated secondary air staging system (SAS) for NOx reduction;
Unit 2: One ESP (Buell hot side type) installed on: One coal/No. 2 oil/on-spec used No. 2 oil-fired electric utility boiler (1,273 mmBtu/hr heat input) Equipped with low-NOx burner system;
Unit 3: Two ESPs (Environmental Elements cold side type) installed in parallel on: One coal/No. 2 oil/on-spec used No. 2 oil-fired electric utility boiler (4,484 mmBtu/hr heat input) Equipped with low-NOx burner system, and Mobotec Rotating Over Fire Air System (2nd ref.), and Rotamix ammonia/urea injection system for NOx reduction.
Units IC-1, IC-2A, and IC-2B: Three No. 2 oil/NG-fired internal combustion turbines rated at 268, 477, and 477 mmBtu/hr, respectively.
| Facility | Rating (MW) | Existing ESP | PostComb. NOx/Tech. | Operation Year | FGD/SO2 Tech. | Operation Year |
|---|---|---|---|---|---|---|
| Sutton | 610 | Cold(3) Hot(1,2) | ROFA(2,3) NH3(3) | 2006 | Wet (3 only) | 2012 |
| Facility | Unit | 2010-2017 (oz.) | 2018-Later (oz.) |
|---|---|---|---|
| Progress Energy Sutton | 1 | 206 | 81 |
| Progress Energy Sutton | 2 | 209 | 82 |
| Progress Energy Sutton | 3 | 955 | 377 |